4.12 Sheet: Changeovers
This sheet defines sequence-dependent changeover times between order families. Each row gives the changeover time on a resource from one family to another. If no row applies, the changeover time is zero.
This sheet is not required.
4.12.1 Column: Resource
Required: No.
Type: Identifier.
Default: All resources.
Description: The resource, or resource group, to which the changeover time applies. A row for a resource takes
precedence over a row for its group, which takes precedence over a row without a resource.
4.12.2 Column: From Family
Required: Yes.
Type: Identifier.
Description: The family of the previous operation on the resource unit.
4.12.3 Column: To Family
Required: Yes.
Type: Identifier.
Description: The family of the next operation on the resource unit. Must be different from the from
family.
4.12.4 Column: Time
Required: Yes.
Type: Excel duration.
Description: The changeover time.