2.11 Orders

An order (also called a job, works order or production order) is a quantity of a product to be made. Each order follows a single routing, and the order is complete when all of the operations of its routing are complete. Orders may also represent one-off jobs such as rework or prototypes, with a routing of their own.

Each order has:

  • a release date: work on the order cannot start before this time, for example because materials will not arrive until then;
  • a due date: the time by which the order should be complete. Due dates are not hard constraints: if an order cannot be completed by its due date it is scheduled late, and its lateness is the time by which it is late;
  • a priority from 1 (most important) to 10 (least important) that determines which orders are scheduled first, or are made late, when there is not enough capacity for all of them;
  • a quantity, which scales the per-unit duration of each operation;
  • optionally, a family, used to calculate changeover times;
  • optionally, a probability: the likelihood that a potential order (such as a quote) becomes a firm order. Probabilities are used only in planning.

An order is either scheduled in full or not at all.