4 Microsoft Excel Input
This section describes the Microsoft Excel input format for the PPS.
The input must be an Office Open XML workbook (.xlsx) or macro-enabled workbook (.xlsm). Office Open XML binary workbooks (.xlsb) and workbooks in the old Excel binary format (.xls) are not supported.
The workbook should contain the sheets listed in Table 2 and described in the following sections. Sheets that are marked as required must be present. Sheet names are not case or white space sensitive.
The workbook may contain sheets other than those recognised by the PPS. Such extra sheets are ignored. Unless otherwise noted, sheets may contain columns other than those described here. Extra columns are ignored, with the exception of extra columns in the Orders sheet, which are copied to the Orders sheet of the output. Columns may appear in any order.
The first row of each sheet contains the column headings, and each following row describes one item. Column headings are not case or white space sensitive. Empty rows are ignored. An empty cell in an optional column takes the column’s default value.
The PPS evaluates any formulas in the workbook when it is loaded. Formulas must not refer to other workbooks. Not all Excel functions are supported; the unsupported functions are listed in Appendix B.
| Sheet | Required | Contents |
| Configuration | Yes | Scenario parameters, including the planning horizon. |
| Resources | Yes | Resources, their groups, capacities and calendars. |
| Operations | Yes | The operations of each routing. |
| Routing Precedences | No | Precedences and delays between the operations of a routing. |
| Orders | Yes | The orders to be planned or scheduled. |
| Order Operations | No | Order-specific operation data, status and progress. |
| Order Precedences | No | Precedences between orders. |
| Shifts | No | Shift start and finish times. |
| Shift Patterns | No | Repeating cycles of shifts. |
| Staff | No | Staff, their skills and shift patterns. |
| Staff Absences | No | Periods when staff are unavailable. |
| Changeovers | No | Sequence-dependent changeover times. |
| Shutdowns | No | Periods when resources are unavailable. |
| Maintenance | No | Maintenance to be scheduled within a window. |
| Capacities | No | Daily capacity overrides for planning. |