1.1 Optimising and Checking

The OLM has two modes of operation. These are:

  1. Optimising: in this mode, the optimiser will create an optimal load plan.
  2. Checking: in this mode, the optimiser will check that a supplied load plan satisfies the axle weight, GCM and capacity constraints. It will report any violations of these constraints.