2.23 Solution Times
In the solution generated by the optimiser, we have the following notions of times:
-
Work Time
In the vehicle summary, this is the time between leaving the START stop and arriving at the FINISH stop in a vehicle’s route. A vehicle’s work time is the total time taken to complete the route, while a load’s work time is the total time taken to complete the load.
-
Site Time
A vehicle’s site time is the sum of all site time incurred over the entire route, while a load’s site time is the sum of all site time incurred during the load.
-
Load Time
A vehicle’s load time is the sum of all load times incurred over the entire route. If batched loads are enabled, then this measure is analogous for each of the vehicle’s loads.
-
Unload Time
A vehicle’s unload time is the sum of all unload time incurred over the entire route. If batched loads are enabled, then this measure is analogous for each of the vehicle’s loads.
-
Service Time
A vehicle’s service time is the sum of all service time incurred over the entire route. If batched loads are enabled, then this measure is analogous for each of the vehicle’s loads.
-
Idle Time
Idle time (wait time) is incurred by a vehicle if it arrives at a location outside of the location’s time windows or if it arrives outside of the order’s time windows. A vehicle’s idle time is the sum of all idle time incurred over the entire route. If batched loads are enabled, then this measure is analogous for each of the vehicle’s loads.
-
Break Time
Break time is incurred if the vehicle has a fatigue management scheme specified (See Section x17-390002.132.13). A vehicle’s break time is the sum of all break time incurred over the entire route. If batched loads are enabled, then this measure is analogous for each of the vehicle’s loads.