3.6 Sheet: Rush Hour
The Rush Hour sheet is used to define time periods where speed scaling takes effect. Note that this feature must be enabled by setting the value of the Rush Hour parameter to TRUE.
This sheet can be omitted if rush hour periods are not required.
3.6.1 Column: Day of Week
Required: No.
Type: Text (Day of Week).
Description: The days of the week on which the rush hour period applies.
3.6.2 Column: Start Date
Required: No.
Type: Excel date.
Description: Starting date of the rush hour period.
3.6.3 Column: End Date
Required: No.
Type: Excel date.
Description: Finishing date of the rush hour period. Must occur after Start Date and be nonnegative.
3.6.4 Column: Time Zone
Required: No.
Type: Text.
Description: A valid standard time zone string for the rush hour.
3.6.5 Column: Start
Required: Yes.
Type: Excel time.
Description: Starting time of the rush hour period.
3.6.6 Column: End
Required: Yes.
Type: Excel time.
Description: Finishing time of the rush hour period. Must occur after Start Time and be nonnegative.
3.6.7 Column: Speed Scale
Required: Yes.
Type: Number.
Description: The speed scaling factor to apply to transit times within the rush hour period.
NOTE: In each row of the sheet, either the ‘Day of Week’ OR both ‘Start Date’ AND ‘End Date’ should be defined but not both.